001-_Addendum_#1_.pdf
|
Addendum #1 was posted on 12/17/2014
|
12/17/2014
|
002-_Addendum_#2_.pdf
|
Addendum #2 was posted on 01/05/2015
|
1/5/2015
|
002-_Addendum_#2A_-_Revised_Drawing_Set_(inclusive_of_Addendum_#1_&_#2).pdf
|
The Revised Drawing Set (Addendum #2A) was posted on 01/05/2015
|
1/5/2015
|
003-_Addendum_#3_.pdf
|
Addendum #3 was posted on 01/05/2015
|
1/5/2015
|
004-_Addendum_#4_.pdf
|
Addendum #4 was posted on 01/13/2015
|
1/14/2015
|
Bid_Tabulation.pdf
|
The Bid Tab for the General Contract was posted on 01/21/2015
|
1/21/2015
|
Bid_Tabulation_-_Asbestos.pdf
|
THe Bid Tab for the Asbestos Abatement was posted on 01/21/2015
|
1/21/2015
|