City of Blair - Disaster No. 4013, Flood Mitigation - Storm Water Pump Station & Utilities

PLEASE NOTE: The time for bid opening has changed to 2:00 PM. The Pre-bid date has been changed to October 8, 2014.
           Place Order 

 

    

Contact:   Chris Koenig
PreBid Date:   10/08/2014 10:00 AM
PreBid Info:   A pre-bid conference will be held at 10:00 AM local time on October 8, 2014 at the City of Blair Water Treatment Plant, 742 Fairview Drive. Attendance at the pre-bid conference is mandatory.

Company:   HDR Engineering Inc. - Omaha
Bid Date:   10/21/2014 02:00 PM CST
Bid Info:   Sealed Bids for the construction of the Storm Water Pump Station and Utilities will be received, by City of Blair, at the office of the City Clerk, City Hall, 218 South 16th Street, Blair, Nebraska, until 2:00 PM local time on October 21, 2014, at which time the Bids received will be publicly opened and read aloud.

Project Location: Blair, Nebraska

Public Notes:
The Project consists of constructing a storm water pump station, flood wall, storm sewer, sanitary sewer and water main.

Bids will be received for a Single Prime Contract. Bids shall be on a unit price basis, with bid items as indicated in the Bid Form.

The Work will be substantially completed on or before August 31, 2015, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before September 30, 2015.

Parts of the Work shall be substantially completed on or before the following Milestone(s):

1. Milestone 1 - March 15, 2015
.....a. 24-inch sanitary sewer construction
.....b. 20-inch water main construction
.....c. Fairview Drive water main removal
.....d. Fairview Drive sanitary sewer abandonment/filling
.....e. 6-inch water main on west side of plant
.....f. Abandonment of 6-inch water main
.....g. Fairview Drive storm sewer
.....h. 6-inch water main offset in Fairview Drive
.....i. Three raw water main encasements
.....j. Chemical line encasement
.....k. Flood gate base

2. Milestone 2 - May 1, 2015
.....a. Detention pond storm sewer
.....b. Pump Station wet well
.....c. Conduit for OPPD
.....d. Pump Station control conduit
.....e. Pump Station control building pad
.....f. 6-inch water main encasement
.....g. 2-inch water main encasement



Job Purchase Information:
Bid Documents may be obtained from the office of A&D Technical Supply Co., Inc., 4320 S. 89th Street, Omaha, NE 68127 (402)592-4950 upon receipt of a non-refundable deposit in the amount of $80.00 payable to A&D Technical Supply Co., Inc. *A Builder's Card will NOT be accepted in lieu of deposit check.

CD's and Downloads containing a full set of Bid Documents in PDF format are available upon receipt of a non-refundable fee in the amount of $30.00 payable to A&D Technical Supply Co., Inc.
Only complete sets of Bid Documents may be obtained.

If shipping of Bid Documents is required, there is a non-refundable fee in the amount of $30.00 payable to A&D Technical Supply Co., Inc.
If shipping of CD is required, there is a flat fee in the amount of $9.00 payable to A&D Technical Supply Co., Inc.

Bid Documents are available PURCHASE ONLY.
Do NOT return Bid Documents, as no deposit refund will be issued.


Addenda
  • 10/01/2014 - Addendum #1 Addendum #1 was faxed on 10-1-2014  Click to View
  • 10/14/2014 - Addendum #2 Addendum #2 was posted/mailed on 10/14/2014  Click to View
  • 10/14/2014 - Addendum #2 (with Revisions) Addendum #2 (with Revisions) was posted/mailed on 10/14/2014  Click to View
  • 10/16/2014 - Addendum #3 Addendum #3 was faxed on 10-16-2014  Click to View
  • 10/20/2014 - Addendum #4 Addendum #4 was faxed on 10/20/2014  Click to View
  • 10/20/2014 - Addendum #5 Addendum #5 was faxed on 10/20/2014  Click to View