Project Description: The Project consists of the removal of existing HVAC units and ductwork
throughout the interior of the building, removal of existing hot/chilled water piping throughout
the interior of the building, removal of the existing cooling tower, removal of the existing chiller,
removal of the existing domestic water heater and storage tank, and removal of various existing
electrical items. The Project also consists of the installation of a geothermal well field, the
installation of heat pump units and associated ductwork, and the installation of various electrical
items. The Project also consists of approximately 9,000 sf of interior renovation which includes
metal stud walls, gypsum board assemblies, hollow metal door frames, wood doors, aluminum
store front framing, carpeting, tile, acoustical tile ceilings, and architectural wood casework.
The Project also includes approximately 12,750 sf of new carpeting and 2,000 sf of new
resilient flooring. The Project will commence on April 22, 2013 and shall be completed by July
26, 2013.
|
|
Job Purchase Information:
|
Documents are available with a refundable $150.00 deposit check payable to Wilber-Clatonia Public Schools at
A & D Technical Supply 1822 N Street Lincoln, NE 68508 402-474-5454 Fax 402-474-5779
Documents may be shipped with $15.00 check payable to A v& D Technical.
|
|
Addenda
|
|
|
|