NebraskaLand National Bank - New Main Bank - Waterproofing Bid
.
Place Order
Contact:
Kathy Robles
PreBid Date:
Not furnished
PreBid Info:
All Bidders are required to make a careful, close examination of the entire building areas before submitting a bid. See 01 1000 Summary for the schedule.
Company:
Wilkins Architecture Design Planning
Bid Date:
07/10/2012
02:00 PM CST
Bid Info:
Project Location:
North Platte, Nebraska
Public Notes:
The Project consists of installation of pre-applied sheet membrane waterproofing beneath concrete slab-on-grade and self-adhering sheet waterproofing on foundation walls and footings.
Job Purchase Information:
Contractors may obtain full sets of Drawings and Project Manual from the following location:
A&D Technical Supply Co., 4320 So. 89th Street, Omaha, NE 68127 (402) 592-4950 ext. 4, or by the Virtual Plan Room at www.adtechsupply.com.
A deposit in the amount of $75.00 (made payable to Wilkins Hinrichs Stober Architects) will be required for each set of bidding documents.
If shipping is required there is a non refundable flat rate of $15.00 per set made payable to A&D Technical Supply.
There will be a $8.00 handling fee for the use of shipper numbers (UPS).
CD's of the project in PDF format are available at a cost of $ 15.00 each, PURCHASE ONLY.
The deposit will be returned in full only if a qualified bid is submitted and the Bid Documents are returned within fifteen (15) days of the bid determination, or if the Contractor decides not to submit a Proposal and the Bid Documents are returned with seven (7) days prior to the bid opening.
All other contractors (WITH THE EXCEPTION OF THE LOW BIDDERS)will return all Bid Documents to:
Wilkins Hinrichs Stober Architects, L.L.C., 2908 W. 39th Street, Suite A, Kearney, Nebraska 68845.
Addenda
07/06/2012 - Addendum #1 Addendum #1 was faxed on 7/6/2012.
Click to View