A & D's Planroom Options
A & D Home
Distribution Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
   Additional Planrooms
State of NE Building Div. Planroom

Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
UNK Fine Arts - Toilet Renovation

.
           Place Order 

 

    

Contact:   Wes Seals
PreBid Date:   06/11/2012 01:00 PM
PreBid Info:   All General Contractors are required, and highly suggested for all other bidders/suppliers to attend a pre-Bid meeting at the time and place indicated below:
June 11, 2012, at 1:00 pm at:
Fine Arts Building, 2506 12th Avenue. Meet at Main East Entry.

Company:   Wilkins Architecture Design Planning
Bid Date:   06/19/2012 02:00 PM
Bid Info:  

Project Location: Kearney, Nebraska

Public Notes:
The Project consists of renovation existing toilet rooms of approx. 650 s.f. and adding a Box Office room of 80 s.f. which includes selective demolition, tile flooring, tile walls, gypsum wall board, steel studs, doors, frames, ACP ceilings, toilet partitions, toilet accessories, mirrors, painting, countertops, light fixtures, plumbing fixtures, electrical, plumbing and mechanical modifications.



Job Purchase Information:
Contractors may obtain full sets of Drawings and Project Manual from the following location:
A&D Technical Supply Co., 4320 So. 89th Street, Omaha, NE 68127 (402) 592-4950 ext. 4, or by the Virtual Plan Room at www.adtechsupply.com.

A deposit in the amount of $75.00 (made payable to Wilkins Hinrichs Stober Architects) will be required for each set of bidding documents.

If shipping is required there is a non refundable flat rate of $20.00 per set made payable to A&D Technical Supply.
There will be a $8.00 handling fee for the use of shipper numbers (UPS).

CD's of the project in PDF format are available at a cost of $ 15.00 each, PURCHASE ONLY.

The deposit will be returned in full only if a) a qualified bid is submitted and the Drawings and Specifications are returned with fifteen(45) days of the bid determination, or if the Contractor decides not to submit a Proposal and the Drawings and Specifications are returned with seven (7) days prior to the bid opening.

All other contractors will return all Bid Documents to: Wilkins Hinrichs Stober Architects, L.L.C., 2908 W. 39th Street, Suite A, Kearney, Nebraska 68845.



Addenda
  • 06/05/2012 - Addendum#1 Addendum #1 will be faxed on 6-5-2012  Click to View
  • 06/15/2012 - Addendum #2 Addendum #2 will be faxed on 6-15-2012  Click to View