Contact:
|
Chris Ehlers
|
|
PreBid Date:
|
Not furnished
|
|
PreBid Info:
|
|
|
|
Company:
|
Lund-Ross Constructors
|
|
Bid Date:
|
04/25/2012
02:00 PM CST
|
|
Bid Info:
|
|
|
|
Project Location:
|
Omaha, Nebraska
|
|
|
|
|
|
|
|
Public Notes:
|
|
Scope of work included but no limited to: Site work, site utilities, street work, concrete curb and gutter, concrete walks, masonry, wood structure, gypsum board walls, EPDM roof, green roof, painted walls, rubber floors, lawn irrigation system, an hydraulic elevator, NFPA 13R sprinkler system, and roof top unit mechanical system.
|
|
Job Purchase Information:
|
Contractors may obtain drawings and specifications for the work from the office of A & D Technical Supply Co., located at 4320 South 89th St, Omaha, NE 68127, (402) 592-4950 ex. 4, or by order through their Virtual Plan Room at www.adtechsupply.com.
A Refundable Deposit of $ 100.00 / or Builders Cards will be required to obtain Bidding Documents.
Checks made payable to Alley Poyner Macchietto Architecture.
Documents must be returned complete and in "like new" condition with in 30 days of the bid opening to obtain a refund. A One Reminder phone call will be placed before deposit is forfeited.
If shipping is required, there is a flat rate of $ 20.00 per set (Please address all checks for shipping to A&D Tech Supply Plan Room).
Please fax a copy of both checks to Laura or Raechel at: (402) 592-9302 before sending them in the mail.
|
|
Addenda- 04/10/2012 - Addendum #1 Addendum #1 was faxed on 4/10/2012. Click to View
- 04/11/2012 - Addendum 2 Addendum #2 was faxed on 4/11/2012. Click to View
- 04/20/2012 - Addendum #3 Addendum #3 will be mailed on 4-20-2012 Click to View
- 04/24/2012 - Addendum #4 Addendum #4 was faxed on 4/24/2012. Click to View
|
|
|
|