A & D's Planroom Options
A & D Home
Distribution Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
   Additional Planrooms
State of NE Building Div. Planroom

Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
Adams Central High School Football Field Reconstruction

The Project consists of the reconstruction of an existing natural turf football field and associated improvements including, but not limited to,
earthwork, storm drainage improvements, irrigation system modifications, erosion control, seeding, sodding and other miscellaneous work.
           Place Order 

 

    

Contact:   Jeff Hinrichs
PreBid Date:   Not furnished
PreBid Info:  

Company:   Wilkins Architecture Design Planning
Bid Date:   12/08/2011 02:00 PM
Bid Info:  

Project Location: Hastings, Nebraska

Public Notes:
Bids signed and under seal, executed, and dated will be received by the Adams Central Public Schools, for the furnishing
of all labor, materials and equipment for the Football Field Reconstruction.
1. Date: Received up to the hour of 2:00 p.m. local time, on Thursday, the Eighth (8) day of December 2011.
2. Location: Office of the Superintendent, Adams Central Junior-Senior High School, 1090 South Adams Central Avenue,
Hastings, Nebraska 68901. Use main entrance.



Job Purchase Information:
Contractors may obtain full sets of Drawings and Project Manual from the following location:
A&D Technical Supply Co., 4320 So. 89th Street, Omaha, NE 68127
(402) 592-4950 ext. 4, or by the Virtual Plan Room at www.adtechsupply.com.

A deposit in the amount of $100.00 (made payable to Wilkins Hinrichs Stober Architects) will be required for each set of bidding documents.

If shipping is required there is a non refundable flat rate of $20.00 per set made payable to A&D Technical Supply.

The deposit will be returned in full only if a) a qualified bid is submitted and the Drawings and Specifications are returned within
fifteen(15) days of the bid determination, or if the Contractor decides not to submit a Proposal and the Drawings and Specifications
are returned with seven (7) days prior to the bid opening.

All other contractors will return all Bid Documents to:
Wilkins Hinrichs Stober Architects, L.L.C.
2908 W. 39th Street, Suite A
Kearney, Nebraska 68845.