Contact:
|
Kristy Cimino
|
|
PreBid Date:
|
11/22/2011
11:00 AM
|
|
PreBid Info:
|
|
|
|
Company:
|
Farris Engineering
|
|
Bid Date:
|
12/08/2011
10:00 AM
|
|
Bid Info:
|
|
|
|
Project Location:
|
Hastings, Nebraska
|
|
|
|
|
|
|
|
Public Notes:
|
|
Central Community College will be replacing their existing fair alarm with a new, addressable fire alarm/mass notification system at the Furnas Building at their Hastings Campus. The system will tie into the Campus-wide fire alarm system over the existing campus fiber optic network. Some mechanical and electrical work, in support of this new system, will take place in the building's attic space.
|
|
Job Purchase Information:
|
Bid Documents may be obtained from A & D Technical Supply upon a deposit payment of $25.00 (Check Only) per set made payable to Farris Engineering, Inc.
If Bid Documents are to be shipped, submit a separate, non-refundable check, made payable to A & D Technical Supply, in the amount of $15.00 per set.
Deposits may be refunded upon receipt of good, usable and complete set of Bid Documents to A&D Technical Supply Co., within 15 days after the Bid opening.
Please fax a copy of both checks to Laura or Raechel at: (402) 592-9302 before sending them in the mail.
|
|
Addenda- 12/01/2011 - Addendum #1 Addendum #1 was faxed on 12/1/2011. Click to View
- 12/06/2011 - Addendum #2 Addendum #2 was faxed on 12/6/2011. Click to View
|