CCC - Pump House Humidity Control

.
           Place Order 

 

    

Contact:   Kristy Cimino
PreBid Date:   11/10/2011 10:00 AM
PreBid Info:   A Pre-Bid Conference will be held for potential Prime Bidders on Thursday, November 10, 2011 at 10:00 A.M. at the Physical Plant Building on the Columbus Campus of Central Community College. No tours will be scheduled before or after the date of the Pre-bid Conference.

Company:   Farris Engineering
Bid Date:   11/18/2011 10:00 AM
Bid Info:  

Project Location: Columbus, Nebraska

Public Notes:
Central Community College is seeking bids to furnish and install a ventilation system within the existing Columbus Campus pump house. The system will provide temperature and humidity control for both the upper and lower levels of the pump house. The ventilation system shall include, but is not limited to, exhaust fan, air distribution system, temperature/humidity controls, and building exhaust & intake louvers.



Job Purchase Information:
Bid Documents may be obtained from A & D Technical Supply upon a deposit payment of $25.00 (Check Only) per set made payable to Farris Engineering, Inc.

If Bid Documents are to be shipped, submit a separate, non-refundable check, made payable to A & D Technical Supply, in the amount of $15.00 per set.

Deposits may be refunded upon receipt of good, usable and complete set of Bid Documents to A&D Technical Supply Co., within 15 days after the Bid opening.

Please fax a copy of both checks to Laura or Raechel at:
(402) 592-9302
before sending them in the mail.


Addenda
  • 11/15/2011 - Addendum #1 Addendum #1 was faxed on 11/15/2011.  Click to View