A & D's Planroom Options
A & D Home
Distribution Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
   Additional Planrooms
State of NE Building Div. Planroom

Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
Weeping Water - Replace Switchboard

.
           Place Order 

 

    

Contact:   Adam Schneckloth
PreBid Date:   06/02/2011 09:00 AM
PreBid Info:   All Bidders (Contractors and Subcontractors) are encouraged to attend and participate in a Pre-Bid Conference where all attending will tour the facility and specific questions will be addressed.
Date: June 2, 2011
Time: 9:00 A.M. Local Time
Place: Front Entry Lobby of the Weeping Water Public Schools on the main level.

Company:   Schemmer Associates Inc
Bid Date:   06/09/2011 02:00 PM
Bid Info:  

Project Location:

Public Notes:
You are invited to bid on a Combined Contract to replace the switchboard and related distribution at the Weeping Water Public Schools that includes Electrical work, minor Site work, and minor General work. The project consists of replacing the outdoor switchboard and transferring loads to new distribution equipment. The project will need to be completed before the start of the 2011-2012 school year.



Job Purchase Information:
Contractors may obtain drawings and specifications for the work from the office of A & D Technical Supply Co., located at 4320 South 89th St, Omaha, NE 68127, (402) 592-4950 ex. 4, or by order through their Virtual Plan Room at www.adtechsupply.com.

A Refundable Deposit of $ 30.00 per set is required for this project.
Checks made payable to Weeping Water Public Schools.

The entire deposit will be refunded upon the return of the Documents to A & D Technical Supply Co., in good condition, within 10 days after the Bid Opening.

If shipping is required, there is a flat rate of $ 20.00 per set (Please address all checks for shipping to A&D Tech Supply Plan Room at 4320 S. 89th St. Omaha, Ne. 68127).



Addenda
  • 06/07/2011 - Addendum #1 Addendum #1 will be mailed on 6-7-2011