CCC - Faculty Pod & Physical Plant & Resource Center - Fascia and Window Replacement

.
           Place Order 

 

    

Contact:   Ken Taylor
PreBid Date:   08/18/2011 11:00 AM
PreBid Info:   PREBID CONFERENCE:
A required Pre-bid Conference will be held on Thursday, August 18, 2011 at 11:00 a.m. at the Physical Plant, on the Central Community College - Columbus campus. Required attendance is for General Contractors only. Meeting attendance is not required for subcontractors but is suggested.

Company:   Wilkins Architecture Design Planning
Bid Date:   08/30/2011 02:30 PM
Bid Info:  

Project Location:

Public Notes:
The Project consists of replacing all associated flashing and perimeter cap flashing and fascia, windows and curtain wall on the Resource Center on the Central Community College Columbus Campus. Work may also include replacing all associated flashing and perimeter cap flashing and fascia on the Faculty Pod and Physical Plant Building.



Job Purchase Information:
Contractors may obtain full sets of Drawings and Project Manual from the following location:
A&D Technical Supply Co., 4320 So. 89th Street, Omaha, NE 68127 (402) 592-4950 ext. 4, or by the Virtual Plan Room at www.adtechsupply.com Drawings available on line at the Virtual Plan Room will be:
Instructions to Bidders, Bid Form, Specifications Table of Contents, Section 101100 Summary of Work, Construction Drawing Images & Addendums.

A deposit in the amount of $75.00 (made payable to Wilkins Hinrichs Stober Architects) will be required for each set of bidding documents.

If shipping is required there is a non refundable flat rate of $15.00 per set made payable to A&D Technical Supply.

The deposit will be returned in full only if the Drawings and Specifications are returned with fifteen (15) days of the bid determination, or if the Contractor decides not to submit a Proposal and the Drawings and Specifications are returned with seven (7) days prior to the bid opening.

Return all Bid Documents to: Wilkins Hinrichs Stober Architects, L.L.C., 2908 W. 39th Street, Suite A, Kearney, Nebraska 68845.


Do NOT returned plans to A&D Technical Supply Co.



Addenda
  • 08/23/2011 - Addendum #1 Addendum #1 was faxed on 8/23/2011.
  • 08/29/2011 - Addendum #2 Addendum #2 was faxed on 8/29/2011/