Westside Community Schools - Westside High School West Campus Chiller Replacement

PLEASE NOTE: Due to circumstances beyond the District’s control, bids will not be opened in public. Bidders are still required to submit hard copies of bid documents as described in the Project Manual. Immediately following the close of bidding, the bid opening will be live streamed. Interested parties can view the opening by logging into the following: https://youtu.be/NCR42u4jZ3Y
           Place Order 

 

    

Contact:   Nate Sheets
PreBid Date:   04/14/2020 01:30 PM CST
PreBid Info:   Bidders are invited to attend a pre-bid conference at: West Highschool – West Campus, 3504 South 108th Street, Omaha, Nebraska 68144 on Tuesday, April 14, 2020 at 1:30 p.m.

Company:   Morrissey Engineering
Bid Date:   04/30/2020 10:00 AM CST
Bid Info:   Westside Community Schools invites bids on: Chiller Replacement, Westside High School – West Campus, 3504 South 108th Street, Omaha, NE. Bids are due by 10:00 A.M. on Thursday, April 30, 2020. Submit bids to: Russ Olsen - Director of Facilities, Westside Community Schools ABC Building, 909 South 76th Street, Omaha, Nebraska 68114.

Project Location: Omaha, Nebraska

Public Notes:
West Highschool – West Campus has an existing water-cooled chiller, cooling tower and associated pumps which WCS desires to replace as they are near the end of their useful life and experiencing major failures. The project includes but is not limited to the following major elements: Removal of the existing chiller; Removal of the existing chilled water pump; Removal of the existing cooling tower; Removal of two existing condenser water pumps; Removal of existing CWS / R piping to accommodate chiller replacement; Removal of existing CS / R piping to accommodate chiller replacement; General demolition to accommodate project; Installation of one new air-cooled chiller, chilled water pumps and associated controls; Installation of new VFDs for new chilled water pumps; Installation of new CWS / R piping; Commissioning new equipment and controls; Electrical modifications to accommodate new mechanical equipment; General Construction to accommodate new mechanical equipment.



Job Purchase Information:
Bid Documents may be obtained from the office of A&D Technical Supply Co., Inc., 4320 S. 89th Street, Omaha, NE 68127 (402) 592-4950 upon receipt of a non-refundable fee in the amount of $35.00 payable to A&D Technical Supply Co., Inc. *A Builder's Card will NOT be accepted in lieu of deposit check.

CD's and Downloads containing a full set of Bid Documents in PDF format are available upon receipt of a non-refundable fee in the amount of $20.00 payable to A&D Technical Supply Co., Inc.
Only complete sets of Bid Documents may be obtained.

If shipping of Bid Documents is required, there is a non-refundable fee in the amount of $25.00 payable to A&D Technical Supply Co., Inc.
If shipping of CD is required, there is a flat fee in the amount of $9.00 payable to A&D Technical Supply Co., Inc.

Bid Documents are available PURCHASE ONLY.
Do NOT return Bid Documents, as no deposit refund will be issued.


Addenda
  • 04/10/2020 - Addendum #1 Addendum #1 was posted on 4-10-2020  Click to View
  • 04/23/2020 - Addendum #2 Addendum #2 was posted on 4-23-2020  Click to View