A & D's Planroom Options
A & D Home
Distribution Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
   Additional Planrooms
State of NE Building Div. Planroom

Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
IWCC - Council Bluffs Campus Hot Water & Steam Line Replacement Dock - Phase II REBID

PLEASE NOTE: The pre-bid time for this project has changed. The new time is 9:00 A.M.
PLEASE NOTE: The bid date on this project has changed. The new bid date is November 26, 2019.
           Place Order 

 

    

Contact:   Kim Bogatz
PreBid Date:   11/07/2019 09:00 AM CST
PreBid Info:   A pre-bid walk through has been scheduled for Thursday, November 7, 2019, at 9:00 a.m., meet at Clark Hall Room 161 for interested Contractors, Suppliers and Subcontractors to view the project site and ask questions. Attendance is not mandatory but suggested.

Company:   HGM Associates Inc.
Bid Date:   11/26/2019 02:00 PM CST
Bid Info:   Sealed bids for the Iowa Western Community College - Council Bluffs Campus Hot Water and Steam Line Replacement, Dock Phase II, Council Bluffs, Iowa, will be received at the Clark Hall Conference Room 161, Iowa Western Community College, 2700 College Road, Council Bluffs, Iowa 51503; (712) 325-3235, until 2:00 p.m. on Tuesday, November 26, 2019, and will be opened publicly.

Project Location: Council Bluffs, Iowa

Public Notes:
The Work includes but is not limited to the following: The removal and replacement of existing concrete pavement and sidewalk areas, removal, modification and/or reconstruction of concrete mechanical vaults, removal and replacement of existing storm sewer, water main and sanitary sewer utilities, new and renovated site lighting, site grading, new landscaping, new ornamental fence, and modification of existing irrigation system.
The majority of civil site work is located between the boiler plant and loading dock to the north, including the courtyard area. The civil site work includes the removal and replacement of existing concrete pavement and sidewalks, removal and replacement of existing utilities (storm sewer, water main and sanitary sewer), site lighting, site grading, new landscaping, new site furnishings, and modification of existing irrigation system. Site structural work includes modifying the existing loading dock and modifications to an existing mechanical vault.
Replace steam lines with hot water lines. Upgrade the central heating plant to provide steam ad hot water to the campus; including new hot water boilers, steam to hot water heat exchanger, pumps, and condensate surge tank. Connect new hot water piping into existing heating water system within the existing campus buildings.



Job Purchase Information:
Bid Documents may be obtained from the office of A&D Technical Supply Co., Inc., 4320 S. 89th Street, Omaha, NE 68127, (402) 592-4950 upon receipt of a refundable deposit in the amount of $200.00 payable to Iowa Western Community College. *A Builder's Card will also be accepted in lieu of deposit check.

CD's and Downloads containing a full set of Bid Documents in PDF format are available upon receipt of a non-refundable fee in the amount of $35.00 payable to A&D Technical Supply Co., Inc.
Only complete sets of Bid Documents may be obtained.

If shipping of Bid Documents is required, there is a non-refundable fee in the amount of $40.00 payable to A&D Technical Supply Co., Inc.
If shipping of CD is required, there is a flat fee in the amount of $9.00 payable to A&D Technical Supply Co., Inc.

Bid Documents MUST be returned, in good condition, within 14 calendar days after award of the project to obtain a deposit refund.
If Bid Documents are NOT returned within the time specified, the deposit check will be forfeited.


Addenda
  • 10/29/2019 - Addendum #1 Addendum #1 was e-mailed on 10-29-2019  Click to View
  • 11/08/2019 - Addendum #2 Addendum #2 was e-mailed on 11-8-2019  Click to View
  • 11/13/2019 - Addendum #3 Addendum #3 was e-mailed on 11-13-2019  Click to View
  • 11/18/2019 - Addendum #4 Addendum #4 was e-mailed on 11-18-2019  Click to View
  • 11/22/2019 - Addendum #5 Addendum #5 was e-mailed on 11-22-2019  Click to View
  • 11/25/2019 - Addendum #6 was e-mailed 11-25-2019  Click to View
  • 11/26/2019 - Bid Tabulation The Bid Tabulation was e-mailed on 111-26-2019  Click to View