Contact:
|
Bryan Rahn
|
|
PreBid Date:
|
08/15/2019
02:30 PM CST
|
|
PreBid Info:
|
A pre-bid meeting for the project will be held on August 15, 2019, at 2:30 p.m. local time starting at Saratoga
Elementary School, 2215 S. 13th Street, Lincoln, NE 68502 and then proceeding to Scott Middle School, 2200
Pine Lake Rd, Lincoln, NE 68512. Attendance by all interested Contractors and Subcontractors is highly
advised.
|
|
|
Company:
|
Engineering Technologies
|
|
Bid Date:
|
08/22/2019
02:00 PM CST
|
|
Bid Info:
|
Sealed proposals will be received by the Board
of Education of Lancaster County School District at the office of LPS Operations, 800 South 24th Street,
Lincoln, Nebraska 68510. Bids are due on or before Thursday August 22, 2019 at 2:00 P.M. CDT for the
furnishing of all labor, materials, equipment, and services for the Project, Bid #9738.
|
|
|
Project Location:
|
Lincoln, NE
|
|
|
|
|
|
|
|
Public Notes:
|
The Work includes but is not limited to:
The installation of air-cooled condensing units and cooling coils at all three schools, corresponding
electrical, general and control work as required, all per the plans and specifications.
Anticipated Starting Date: September 16, 2019
Anticipated Completion Date: December 18, 2019
|
|
Job Purchase Information:
|
Construction Documents may be obtained by calling A&D Technical Supply,
http://www.adtechplans.com (1822 N Street, Lincoln, NE. 68508, Phone 402-474-5454, Fax 402-474-5779)
(4320 South 89th Street, Omaha, NE., Phone 402-592-4950, Fax 402-592-9302) upon receipt of a $25.00
deposit, checks made payable to Lincoln Public Schools.
Deposits will be refunded if all documents are returned
in good condition within 14 calendar days after the date of the bid opening.
An additional non-refundable
$15.00 will be required for documents to be mailed.
Partial sets will not be issued.
Per LPS, digital copies are not available for this project.
|
|