|
|
Contact:
|
Kim Bogatz
|
|
PreBid Date:
|
07/09/2019
01:30 PM CST
|
|
PreBid Info:
|
A pre-bid walk through has been scheduled for Tuesday July 9, 2019 at 1:30 p.m., meet at Clark
Hall Room 161 for interested Contractors, Suppliers and Subcontractors to view the project site
and ask questions. Attendance is not mandatory but suggested.
|
|
|
Company:
|
HGM Associates Inc.
|
|
Bid Date:
|
07/25/2019
02:00 PM CST
|
|
Bid Info:
|
Sealed bids for the Iowa Western Community College - Council Bluffs Campus
Utility/Courtyard Improvements Phase II, Council Bluffs, Iowa, will be received at the
Purchasing Office, located in Ashley Hall 144, Iowa Western Community College, 2700 College
Road, Council Bluffs, Iowa 51503; (712) 325-3235, until 2:00 p.m. on Thursday, July 25, 2019
and will be opened publicly in Clark Hall Conference Room 161.
|
|
|
Project Location:
|
Council Bluffs, Iowa
|
|
|
|
|
|
|
|
Public Notes:
|
The Work includes but is not limited to the following: Construction of a new addition to an existing building to enclose egress stairs. Materials for this portion of work shall include but are not limited to concrete
foundations, walls and slabs, masonry, steel roof joists, metal decking, concrete
floor topping, metal furring, hollow metal doors and frames, single ply membrane
roofing, insulation and interior and exterior finishes. Mechanical and electrical
systems are included in the work. The removal and replacement of existing concrete pavement and sidewalk areas,
removal, modification and/or reconstruction of concrete mechanical vaults,
removal and replacement of existing storm sewer, water main and sanitary sewer
utilities, new and renovated site lighting, site grading, new landscaping, new
ornamental fence, and modification of existing irrigation system. The construction of a new heating hot water piping system for the campus,
replacement of chilled water lines to several buildings, as well as retrofitting and
new hot water generating equipment. The new piping shall be connected within
each building. Materials for this portion of work shall include but are not limited
to underground hot water and chilled water piping. New boiler plant equipment,
including new condensing boilers, expansion tank, air separator, pumps and
piping. New water heaters will be installed in several buildings as well.
Electrical systems are included in the work.
|
|
Job Purchase Information:
|
Bid Documents may be obtained from the office of A&D Technical Supply Co., Inc., 4320 S. 89th Street, Omaha, NE 68127, (402) 592-4950 upon receipt of a refundable deposit in the amount of $200.00 payable to Iowa Western Community College. *A Builder's Card will also be accepted in lieu of deposit check.
CD's and Downloads containing a full set of Bid Documents in PDF format are available upon receipt of a non-refundable fee in the amount of $50.00 payable to A&D Technical Supply Co., Inc. Only complete sets of Bid Documents may be obtained.
If shipping of Bid Documents is required, there is a non-refundable fee in the amount of $55.00 payable to A&D Technical Supply Co., Inc. If shipping of CD is required, there is a flat fee in the amount of $9.00 payable to A&D Technical Supply Co., Inc.
Bid Documents MUST be returned, in good condition, within 14 calendar days after award of the project to obtain a deposit refund. If Bid Documents are NOT returned within the time specified, the deposit check will be forfeited.
|
|
Addenda- 07/15/2019 - Addendum #1 Addendum #1 was e-mailed on 7-15-2019 Click to View
- 07/18/2019 - Addendum #2 Addendum #2 was e-mailed on 7-18-2019 Click to View
- 07/22/2019 - Addendum #3 was e-mailed 7-22-2019. Click to View
- 07/24/2019 - Addendum #4 was e-mailed 7-24-2019. Click to View
|
|
|
|