Contact:
|
Katie Ramsbottom
|
|
PreBid Date:
|
08/29/2018
02:00 PM CST
|
|
PreBid Info:
|
All Bidders are required to attend and other interested parties are invited to attend a Pre-Bid
meeting for distribution of information and tour of Project Site.
1. TIME: Wednesday, August 29, 2018; 2:00 PM Local Time.
2. PLACE: University of Nebraska Medical Center
Facilities Management and Planning 4230 Building - Room 2007
Omaha, Nebraska
3. Parking: There will be limited parking stalls located on the North side of the 4230 Building that will be
available on a first come – first served basis. Additional parking will be available in Lot 25 located at the Southeast Corner of 42nd & Leavenworth Streets.
|
|
|
Company:
|
RDG Planning Design
|
|
Bid Date:
|
09/11/2018
02:00 PM CST
|
|
Bid Info:
|
BID RECEIVING AND OPENING: Sealed Bid Proposals as follows:
RECEIVING TIME: Tuesday, September 11, 2018; 2:00 PM Local Time. RECEIVING PLACE: Purchasing Department, by one of following methods:
Hand-Carry Delivery: Facilities Management and Planning, Room 2019
4230 Leavenworth St.
Omaha, Nebraska
Mailing Address: Facilities Management and Planning
University of Nebraska Medical Center
987100 Nebraska Medical Center
Omaha, Nebraska 68198-7100
Express Mailing Address: (UPS, FedEx, Airborne, etc.) General Supply, University of Nebraska Medical Center, 601 South Saddle Creek Road
Omaha, Nebraska 68105. Parking: There will be limited parking stalls located on the North side of the 4230 Building that will be
available on a first come – first served basis. Bids are valid only if deposited at designated location prior to receiving time. All Bids are registered by automatic time clock at time of deposit. Bids deposited after receiving time will be returned unopened. Valid Bids will be publicly opened and read aloud. All Bidders and interested parties are invited to attend. A Bidder's List of the Bids shall be available for attendees.
|
|
|
Project Location:
|
Omaha, Nebraska
|
|
|
|
|
|
|
|
Public Notes:
|
|
The Work of Project is defined by the Contract Documents and consists of the following renovation and
rehabilitation work at UNMC’s existing Williams Science Hall building: Rehabilitation of the following exterior envelop components: Seal and coat existing EIFS walls, Replace existing glazing with new glazing in existing frames, Replace existing exterior storefront doors and hardware; Renovation of building interior configuration to general science instruction, including: Reconfiguring spaces as shown on the Drawings, Relocating restroom facilities, Renovation of interior finishes, New wood doors and hardware in existing hollow metal frames where indicated on the
Drawings; Updating of life safety and security features, including: New guard railing and hand railing at existing stair towers, Access control hardware at select doors indicated on the Drawings, Renovation of shaft walls, fire walls, and other building code updates; Complete renovation of HVAC system as indicated on the Drawings; Renovation of building electrical system and lighting as indicated on the Drawings.
|
|
Job Purchase Information:
|
Bid Documents may be obtained from the office of A&D Technical Supply Co., Inc., 4320 S. 89th Street, Omaha, NE 68127 (402)592-4950 upon receipt of a NON-REFUNDABLE fee in the amount of $325.00 payable to A&D Technical Supply Co., Inc. *A Builder's Card will NOT be accepted in lieu of deposit check.
CD's and Downloads containing a full set of Bid Documents in PDF format are available upon receipt of a non-refundable fee in the amount of $100.00 payable to A&D Technical Supply Co., Inc. Only complete sets of Bid Documents may be obtained.
If shipping of Bid Documents is required, there is a non-refundable fee in the amount of $100.00 payable to A&D Technical Supply Co., Inc. If shipping of CD is required, there is a flat fee in the amount of $9.00 payable to A&D Technical Supply Co., Inc.
Bid Documents are available PURCHASE ONLY. Do NOT return Bid Documents, as no deposit refund will be issued.
|
|
Addenda- 09/07/2018 - Addendum #1 Addendum #1 was posted on 9-7-2018 Click to View
- 09/07/2018 - Addendum #2 Addendum #2 was posted on 9-7-2018 Click to View
|
|
|
|