Contact:
|
Jake Zimmerer
|
|
PreBid Date:
|
Not furnished
|
|
PreBid Info:
|
|
|
|
Company:
|
Olmsted & Perry Consulting Engineers Inc.
|
|
Bid Date:
|
06/14/2018
10:00 AM CST
|
|
Bid Info:
|
Sealed Bids for the construction of the HIGHWAY 75 UTILITY RELOCATIONS, WILES ROAD TO OSAGE
RANCH BOULEVARD will be received, by City Of Plattsmouth, Nebraska, at the office of the Engineer,
OLMSTED & PERRY CONSULTING ENGINEERS INC., until 10:00 A.M. local time on Thursday, June 14,
2018, at which time the Bids received will be “publicly” opened and read.
|
|
|
Project Location:
|
Plattsmouth, Nebraska
|
|
|
|
|
|
|
|
Public Notes:
|
|
The Project consists of
construction of approximately 4,600 linear feet of 12-inch ductile iron water main along with fire
hydrants, valves, fittings, bores, and other miscellaneous appurtenances. The project also includes the
removal of approximately 4,400 linear feet of existing 12-inch water main to be salvaged to the City.
|
|
Job Purchase Information:
|
Bid Documents may be obtained from the office of A&D Technical Supply Co., Inc., 4320 S. 89th Street, Omaha, NE 68127, (402) 592-4950 upon receipt of a refundable deposit in the amount of $40.00 payable to Olmsted & Perry Consulting Engineers Inc. *A Builder's Card will NOT be accepted in lieu of deposit check.
CD's and Electronic Downloads containing a full set of Bid Documents in PDF format are available upon receipt of a non-refundable fee in the amount of $20.00 payable to A&D Technical Supply Co., Inc. Only complete sets of Bid Documents may be obtained - no partial set orders will be issued.
If shipping of Bid Documents is required, there is a non-refundable fee in the amount of $20.00 payable to A&D Technical Supply Co., Inc. If shipping of CD is required, there is a flat fee in the amount of $9.00 payable to A&D Technical Supply Co., Inc.
Bid Documents MUST be returned, in good condition, within 14 calendar days from award of the project to obtain a deposit refund. If Bid Documents are NOT returned within the time specified, the deposit check will be forfeited.
|
|
Addenda- 06/08/2018 - Addendum #1 Addendum #1 was faxed on 6-8-2018 Click to View
- 06/14/2018 - Bid Tabulation The Bid Tabulation was posted on 6-14-2018 Click to View
|
|
|
|