Contact:
|
Chris Koenig
|
|
PreBid Date:
|
05/03/2018
10:00 AM CST
|
|
PreBid Info:
|
A pre-bid conference will be held at 10:00 AM local time on May 3, 2018 at the south end of South 17th
Avenue, Blair, Nebraska. Attendance at the pre-bid conference is voluntary.
|
|
|
Company:
|
HDR Engineering Inc. - Omaha
|
|
Bid Date:
|
05/15/2018
11:00 AM CST
|
|
Bid Info:
|
Sealed Bids for the construction of the South Pump Station will be received, by the City of Blair, at the
office of the City Clerk, City Hall, 218 South 16th Street, Blair, Nebraska, until 11:00 AM local time on
May 15, 2018, at which time the Bids received will be publicly opened and read.
|
|
|
Project Location:
|
Blair, Nebraska
|
|
|
|
|
|
|
|
Public Notes:
|
|
The Project consists of
a demolition of an existing ground storage reservoir, prefabricated water booster pumping station,
approximately 42 LF of 12 IN water main and appurtenances, site preparation for installation of the
pumping station, telemetry for communication between the pump station and Owner’s remote Water
Treatment Facility and site electrical.
|
|
Job Purchase Information:
|
Bid Documents may be obtained from the office of A&D Technical Supply Co., Inc., 4320 S. 89th Street, Omaha, NE 68127, (402) 592-4950 upon receipt of a non-refundable fee in the amount of $25.00 payable to A&D Technical Supply Co., Inc. *A Builder's Card will NOT be accepted in lieu of deposit check.
CD's and Downloads containing a complete set of Bid Documents in PDF format are available upon receipt of a non-refundable fee in the amount of $15.00 payable to A&D Technical Supply Co., Inc. Only complete sets of Bid Documents may be obtained.
If shipping of Bid Documents is required, there is a non-refundable fee in the amount of $20.00 payable to A&D Technical Supply Co., Inc. If shipping of CD is required, there is a flat fee in the amount of $9.00 payable to A&D Technical Supply Co., Inc.
Bid Documents are available PURCHASE ONLY. Do NOT return Bid Documents as no deposit refund will be issued.
|
|
Addenda- 05/07/2018 - Addendum #1 Addendum #1 will be faxed on 5-7-2018 Click to View
- 05/10/2018 - Addendum #2 Addendum #2 was posted on 5-10-2018 Click to View
|
|
|
|