|
|
Contact:
|
Matthew Shimerdla
|
|
PreBid Date:
|
Not furnished
|
|
PreBid Info:
|
|
|
|
Company:
|
Schemmer Associates
|
|
Bid Date:
|
04/19/2018
02:00 PM CST
|
|
Bid Info:
|
Sealed proposals will be received by the CITY OF WAVERLY, P.O. Box 427, 14130 Lancashire
Street, Waverly NE, 68462-0427 until 2:00 p.m. on the 19th day of April, 2018.
|
|
|
Project Location:
|
Waverly, NE
|
|
|
|
|
|
|
|
Public Notes:
|
GROUP A – Amberly Road, 142nd Street – 148th Street (Project 1). This segment shall
include pavement removal and reconstruction with a three lane section, turning lanes, curb
and gutter and storm sewer system. Approximate major quantities include:
PAVT & SIDEWALK REM, 1,695 CY
EXCAVATION, 2,040 CY
EXCAVATION – BORROW, 8,199 CY
PCC PAVT W/INT CURB, 9”, 12,085 SY
RCP STORM SEWER, CL III 1,783, LF
GROUP B – Folkestone Street, 145th Street – 148th Street (Project 3). This segment shall
include pavement removal and reconstruction with curb and gutter and driveway approaches.
Approximate major quantities include:
PAVT & SIDEWALK REM, 925 CY
PCC PAVT W/INT CURB, 7”, 3,229 SY
CONC DRIVEWAY, 6”, 5,340 SF
GROUP C – 143RD Street, Amberly Road – Jamestown (Project 4). This segment shall
include asphalt resurfacing with mill and overlay, concrete curb and gutter replacement, and
curb ramp construction. Approximate major quantities include:
CONC SIDEWALK, 3,910 SF
SURFACE MILLING, 10,162 SY
ASPHALTIC CONCRETE, TYPE LC, 555 TON
ASPHALTIC CONCRETE, TYPE SPR, 1,499 TON
|
|
Job Purchase Information:
|
Construction Documents may be obtained by visiting A&D Technical Supply website
http://www.adtechplans.com (1822 N Street, Lincoln, NE. 68508, Phone 402-474-5454, Fax 402-474-5779) upon receipt of a non-refundable payment of $30 payable to A&D Technical Supply Co., Inc.
An additional non-refundable
$15.00 fee will be required for documents to be mailed.
Plans are also available for a digital download for free per the architect.
|
|
Addenda
|
|
|
|