Contact:
|
Kurt Hassler
|
|
PreBid Date:
|
02/27/2018
10:00 AM CST
|
|
PreBid Info:
|
A pre-bid site visit has been scheduled for February 27, 2018 at 10:00 A.M., at the Council
Bluffs Water Pollution Control Plant, 18452 Applewood Road for interested Contractors,
Suppliers, and Subcontractors to discuss the project, ask questions, and visit the project site.
Attendance is not mandatory, but suggested. If you cannot attend this site visit
an alternate time can be arranged by contacting Susan Marino, PE at George Butler Associates,
10212 F Street, Omaha NE 68127, phone: 402-513-3157, email: smarino@gbateam.com, prior to
March 7, 2018.
|
|
|
Company:
|
George Butler Associates Omaha
|
|
Bid Date:
|
03/20/2018
10:00 AM CST
|
|
Bid Info:
|
Sealed bids will be received at the 209 Pearl Street Office of the City Clerk until 10:00 A.M. on
Tuesday, March 20, 2018, for all work set forth in the plans, specifications and proposals for
the above mentioned project. Bids will be opened and publicly read immediately following the
filing deadline in the City Clerk’s Office of City Hall.
|
|
|
Project Location:
|
Council Bluffs, Iowa
|
|
|
|
|
|
|
|
Public Notes:
|
MAJOR ITEMS OF WORK for this project include the following approximate quantities: Rehabilitation of the interior of Manhole 1 (which consists of four 3’10” x 5’-0” chambers which split
flow to the primary clarifiers and one 6’-2” square influent center chamber), with corrosion resistant
structural material (327 SF) followed by a corrosion resistant protective liner (1645 SF); and
rehabilitation of influent Pipe 1 (40 LF of 48 inch) and Pipes 2, 3, 4, and 5 (430 LF of 30 inch dia.)
with a corrosion resistant structural liner. Also included is bypass pumping to complete the
rehabilitation work and additional bypass pumping to enable CCTV and condition assessment in
downstream piping and structures (Primary Clarifiers to Manhole 2). Additional work includes anchor
bolt installations, erosion control, surface restoration, materials, equipment, and all other appurtenances
necessary to complete the full project. Two Alternatives are specified for bid and generally described as follows: Alternate “A” includes rehabilitation of Manhole 1 by repair with cementitious structural material and
epoxy lining of the full interior, CIPP lining of Pipes 1 thru 5, bypass pumping to accomplish this work,
bypass pumping for additional CCTV and condition assessment, installation of anchor bolts, and site
cleanup with seeding. Alternate “B” includes rehabilitation of Manhole 1 by repair with geopolymer structural material and
geopolymer lining of the full interior, lining of Pipes 1 thru 5 with geopolymer material, bypass
pumping to accomplish this work, bypass pumping for additional CCTV and condition assessment,
installation of anchor bolts, and site cleanup with seeding.
|
|
Job Purchase Information:
|
Bid Documents may be obtained from the office of A&D Technical Supply Co., Inc., 4320 S. 89th Street, Omaha, NE 68127, (402) 592-4950 upon receipt of a refundable deposit in the amount of $125.00 payable to George Butler Associates, Inc. *A Builder's Card will NOT be accepted in lieu of deposit check. Only complete sets of Bid Documents may be obtained - no partial set orders will be issued.
If shipping of Bid Documents is required, there is a non-refundable fee in the amount of $20.00 payable to A&D Technical Supply Co., Inc.
Bid Documents MUST be returned, in good condition, within 14 calendar days from the date of award to obtain a deposit refund. If Bid Documents are NOT returned within the time specified, the deposit check will be forfeited.
|
|
Addenda- 03/07/2018 - Addendum #1 Addendum #1 was mailed on 3-7-2018 Click to View
- 03/23/2018 - Bid Tabulation The Bid Tabulation was posted on 3-23-2018 Click to View
|
|
|
|