A & D's Planroom Options
A & D Home
Distribution Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
   Additional Planrooms
State of NE Building Div. Planroom

Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
NEARNG - Penterman Parking Lot

.
           Place Order 

 

    

Contact:   Valerie DeHart
PreBid Date:   02/22/2018 09:30 AM CST
PreBid Info:   A Pre-Bid Meeting and Walk-Through will be held at the Penterman Readiness Center at 9:30am on 2/22/2018. This Pre-Bid Meeting and Walk-Through is not mandatory for all bidders.

Company:   Davis Design
Bid Date:   03/08/2018 01:30 PM CST
Bid Info:   Proposals must be submitted to the Construction & Facilities Management Office, Nebraska Army National Guard, 2433 NW 24th Street, Lincoln, Nebraska 68524 before 1:30pm on 3/8/2018 and then opened publicly and read aloud at 2:00pm

Project Location: Lincoln, NE

Public Notes:
SCOPE OF WORK: The Penterman RC Parking Lot and Sidewalk Repair Project consists all labor, materials, supervision, equipment, site work, travel, licenses, permits, etc. to replace the existing asphalt paving with new concrete paving including all removals as needed and sub-base preparation for the new paving and walks as per the contract documents. In addition, the project includes widening of the west entrance, new concrete walks, new stoops, new comm box top, bollards, striping, joints sealants, etc. per the plans and specifications. This project is located on the Air National Guard Base.



Job Purchase Information:
Printed Documents may be obtained by contacting A & D Technical Supply located at 1822 ā€˜N’ Street in Lincoln, Nebraska (Telephone: 402-474-5454). A refundable deposit in the amount of $50.00 made payable to Davis Design is due at pick-up.

Documents can be shipped for an additional non-refundable payment of $15 to A&D Technical Supply Co.

The deposit will be returned to the Bidder upon return of the Plans, Specifications and Addenda in good condition, within thirty (30) days after the bid opening date, to the plans supply house listed above.


Addenda