Contact:
|
Jim Kardisco
|
|
PreBid Date:
|
Not furnished
|
|
PreBid Info:
|
|
|
|
Company:
|
Dicon Construction
|
|
Bid Date:
|
02/07/2018
02:00 PM CST
|
|
Bid Info:
|
Dicon is accepting proposals for the construction of a new Courtyard by Marriott hotel. Bids may be submitted by email to bid@dicon.com or by fax at (402) 493-5549. Bids are due by 2:00 PM on February 7, 2018.
|
|
|
Project Location:
|
Sioux City, Iowa
|
|
|
|
|
|
|
|
Public Notes:
|
The Site Removals and Site Utilities have already been bid out for this project. Work consists of: Earthwork, Grading, Auger Cast Piles, Paving, Landscaping, Cast-In-Place Concrete, Gypcrete, Concrete Block, Masonry, Structural Steel, Steel Erection, Metal Fabrications, Rough Carpentry Materials, Framing, Finish Carpentry, Wood Casework, Laminate Casework, Solid Surface & Laminate Countertops, FRP, Waterproofing, Building Insulation, EIFS, Metal Wall Panels, Siding, Membrane Roofing, Fireproofing, Joint Sealants, Hollow Metal Doors and Frames, Wood Doors, Automatic Entrances, Aluminum Storefront, Aluminum Windows, Door Hardware, Drywall, Metal Studs, Ceramic Tile, Acoustical Ceilings, Resilient Flooring, Carpet, Painting, Wall Coverings, Signage, Corner Guards, Toilet Accessories, Fire Extinguishers & Cabinets, Lockers, Flagpoles, Swimming Pool, Elevators, Chutes, Fire Sprinkler, Plumbing, HVAC, Electrical, Communications, & Security. Project consists of an 85,900 sf hotel and associated site work.
|
|
Job Purchase Information:
|
Bid Documents may be obtained from the office of A&D Technical Supply Co., Inc., 4320 S. 89th Street, Omaha, NE 68127 (402)592-4950 upon receipt of a non-refundable fee in the amount of $310.00 payable to A&D Technical Supply Co., Inc. *A Builder's Card will NOT be accepted in lieu of deposit check.
CD's and Downloads containing a full set of Bid Documents in PDF format are available upon receipt of a non-refundable fee in the amount of $45.00 payable to A&D Technical Supply Co., Inc. Only complete sets of Bid Documents may be obtained.
If shipping of Bid Documents is required, there is a non-refundable fee in the amount of $50.00 payable to A&D Technical Supply Co., Inc. If shipping of CD is required, there is a flat fee in the amount of $9.00 payable to A&D Technical Supply Co., Inc.
Bid Documents are available PURCHASE ONLY. Do NOT return Bid Documents, as no deposit refund will be issued.
|
|
Addenda- 01/16/2018 - Addendum #1 Addendum #1 was posted on 1-9-2018 Click to View
- 01/16/2018 - Addendum #2 Addendum #2 was posted on 1-16-2018 Click to View
- 01/23/2018 - Addendum #3 Addendum #3 was posted on 1-23-2018 Click to View
- 02/02/2018 - Addendum #4 Addendum #4 was posted on 2-2-2018 Click to View
- 02/02/2018 - Addendum #5 Addendum #5 was posted on 2-2-2018 Click to View
|
|
|
|