|
|
Contact:
|
Karie Sloup
|
|
PreBid Date:
|
01/05/2018
10:30 AM CST
|
|
PreBid Info:
|
The Architect-Engineer will hold a Pre-Bid Conference at the Community
Association Office Friday, January 5, 2018, at 10:30 AM (CST). All prime Bidders are encouraged to
attend.
|
|
|
Company:
|
DLR Group Inc.
|
|
Bid Date:
|
01/31/2018
12:00 PM CST
|
|
Bid Info:
|
Bids will be received until 12:00 PM (CST), on Wednesday, January 31, 2018, by Brandi Jorgensen at
Dakota Dunes Community Association office located at 319 Dakota Dunes Blvd., Suite B, Dakota Dunes,
South Dakota 57049. Bids received after this time will not be accepted. Bids will be privately opened. In addition to the Owner and the Architect-Engineer, the General Contractors
may attend the private opening.
|
|
|
Project Location:
|
Dakota Dunes, South Dakota
|
|
|
|
|
|
|
|
Public Notes:
|
|
The Dakota Dunes Community Association, Inc. will receive Bids for a Combined Contract, including
General Construction and site development for replacement of exterior signage and landscaping throughout
the Dakota Dunes neighborhood.
|
|
Job Purchase Information:
|
Bid Documents may be obtained from the office of A&D Technical Supply Co., Inc., 4320 S. 89th Street, Omaha, NE 68127, (402) 592-4950, upon depositing the sum of one hundred dollars ($100.00) for each set of Documents. Checks shall be
made out to DLR Group Inc.
CD's and Downloads containing a full set of Bid Documents in PDF format are available upon receipt of a non-refundable fee in the amount of $15.00 payable to A&D Technical Supply Co., Inc. Only complete sets of Bid Documents may be obtained.
If shipping of Bid Documents is required, there is a non-refundable fee in the amount of $20.00 payable to A&D Technical Supply Co., Inc. If shipping of CD is required, there is a flat fee in the amount of $9.00 payable to A&D Technical Supply Co., Inc.
Bid Documents MUST be returned, in good condition, within 30 calendar days of Bid Opening to obtain a deposit refund.
|
|
Addenda- 01/15/2018 - Addendum #1 Addendum #1 was mailed on 1-15-2018 Click to View
- 01/26/2018 - Addendum #2 Addendum #2 was posted and faxed on 1-26-2018 Click to View
|
|
|
|