Sealed Bids for the construction of the BUFFALO CREEK BASIN SANITARY SEWER FORCE MAIN will be
received, by City Of Gretna, Nebraska, at the office of the Engineer, OLMSTED & PERRY CONSULTING
ENGINEERS INC., until 10:00 A.M. local time on Tuesday, January 31, 2017, at which time the Bids
received will be “publicly” opened and read.
|
|
|
Project Location:
|
Gretna, Nebraska
|
|
|
|
|
|
|
|
Public Notes:
|
|
The Project consists of 14,040 LF of 16”Dia. FPVC Force
main, 13,040 LF horizontal directional drilling, air release valve and manholes, 285 LF of 18”Dia. PVC
Gravity Sewer, 715 LF bore and jack steel casing and related appurtenances.
|
|
Job Purchase Information:
|
Bid Documents may be obtained from the office of A&D Technical Supply Co., Inc., 4320 S. 89th Street, Omaha, NE 68127, (402)592-4950 upon receipt of a refundable deposit in the amount of $45.00 payable to Olmsted & Perry Consulting Engineers Inc. *A Builder's Card will NOT be accepted in lieu of deposit check.
CD's and Electronic Downloads containing a full set of Bid Documents in PDF format are available upon receipt of a non-refundable fee in the amount of $20.00 payable to A&D Technical Supply Co., Inc. Only complete sets of Bid Documents may be obtained - no partial set orders will be issued.
If shipping of Bid Documents is required, there is a non-refundable fee in the amount of $25.00 payable to A&D Technical Supply Co., Inc. If shipping of CD is required, there is a flat fee in the amount of $9.00 payable to A&D Technical Supply Co., Inc.
Bid Documents MUST be returned, in good condition, within 14 calendar days from award of the project to obtain a deposit refund. If Bid Documents are NOT returned within the time specified, the deposit check will be forfeited.
|
|
Addenda- 01/24/2017 - Addendum #1 Addendum #1 was faxed on 1-25-2017 Click to View
- 01/27/2017 - Addendum #2 Addendum # 2 was posted and faxed on 1-27-2017. Click to View
- 01/31/2017 - Bid Tabulation The Bid Tabulation was posted on 1-31-2017 Click to View
|
|
|
|