A & D's Planroom Options
A & D Home
Distribution Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
   Additional Planrooms
State of NE Building Div. Planroom

Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
Eureka School Addition

.
           Place Order 
 #  Sheet # Sheet Name Image Name (Click To View)
File Size
 009
 
SpecToc
009-_SpecToc_.pdf
0 KB
 010
 TS.1
Title Sheet
010-TS.1_Title_Sheet.tif
0 KB
 011
 C1
Topographic Survey
011-C1_Topographic_Survey.tif
0 KB
 012
 C2
Demolition Plan
012-C2_Demolition_Plan.tif
0 KB
 013
 C3
Erosion Control Narrative
013-C3_Erosion_Control_Narrative.tif
0 KB
 014
 C4
Erosion Control Narrative
014-C4_Erosion_Control_Narrative.tif
0 KB
 015
 C5
Erosion Control Narrative
015-C5_Erosion_Control_Narrative.tif
0 KB
 016
 C6
Erosion Control Plan
016-C6_Erosion_Control_Plan.tif
0 KB
 017
 C7
Site Plan
017-C7_Site_Plan.tif
0 KB
 018
 C8
Grading Plan - Base Bid
018-C8_Grading_Plan_-_Base_Bid.tif
0 KB
 019
 C9
Grading Plan - Base Bid with Alternates
019-C9_Grading_Plan_-_Base_Bid_with_Alternates.tif
0 KB
 020
 C10
Utility Plan
020-C10_Utility_Plan.tif
0 KB
 021
 C11
Standard Details
021-C11_Standard_Details.tif
0 KB
 022
 C12
Standard Details
022-C12_Standard_Details.tif
0 KB
 023
 C13
Standard Details
023-C13_Standard_Details.tif
0 KB
 024
 C14
Standard Details
024-C14_Standard_Details.tif
0 KB
 025
 AD.1
Demolition Plan - Phase 1 & 2
025-AD.1_Demolition_Plan_-_Phase_1_&_2.tif
0 KB
 026
 AD.2
Demolition Sections - Phase 2
026-AD.2_Demolition_Sections_-_Phase_2.tif
0 KB
 027
 CR.1
Code Review
027-CR.1_Code_Review.tif
0 KB
 028
 A1.00
Site Plan - Existing
028-A1.00_Site_Plan_-_Existing.tif
0 KB
 029
 A1.01
Site Plan - Base Bid
029-A1.01_Site_Plan_-_Base_Bid.tif
0 KB
 030
 A2.00
Overall Floor Plan - Phase 1
030-A2.00_Overall_Floor_Plan_-_Phase_1.tif
0 KB
 031
 A2.01
Roof Plan - Phase 1
031-A2.01_Roof_Plan_-_Phase_1.tif
0 KB
 032
 A2.02
Phase 1 Floor Plan - Addition North
032-A2.02_Phase_1_Floor_Plan_-_Addition_North.tif
0 KB
 033
 A2.03
Phase 1 Floor Plan - Addition South
033-A2.03_Phase_1_Floor_Plan_-_Addition_South.tif
0 KB
 034
 A2.04
Phase 1 - Enlarged Floor Plans
034-A2.04_Phase_1_-_Enlarged_Floor_Plans.tif
0 KB
 035
 A2.05
Phase 1 - Enlarged Floor Plans
035-A2.05_Phase_1_-_Enlarged_Floor_Plans.tif
0 KB
 036
 A2.06
Phase 1 - Enlarged Floor Plans
036-A2.06_Phase_1_-_Enlarged_Floor_Plans.tif
0 KB
 037
 A2.07
Main Level Floor PLan - Phase 2 Add.
037-A2.07_Main_Level_Floor_PLan_-_Phase_2_Add..tif
0 KB
 038
 A2.08
Phase 2 - Enlarged Floor Plans
038-A2.08_Phase_2_-_Enlarged_Floor_Plans.tif
0 KB
 039
 A2.09
Overall Floor Plan - Alternates
039-A2.09_Overall_Floor_Plan_-_Alternates.tif
0 KB
 040
 A2.10
Alternates
040-A2.10_Alternates.tif
0 KB
 041
 A2.11
Alternates
041-A2.11_Alternates.tif
0 KB
 042
 A3.00
Exterior Elevations
042-A3.00_Exterior_Elevations.tif
0 KB
 043
 A3.01
Interior Elevations
043-A3.01_Interior_Elevations.tif
0 KB
 044
 A3.02
Interior Elevations
044-A3.02_Interior_Elevations.tif
0 KB
 045
 A3.03
Interior Elevations
045-A3.03_Interior_Elevations.tif
0 KB
 046
 A3.04
Interior Elevations
046-A3.04_Interior_Elevations.tif
0 KB
 047
 A3.05
Phase 2 - Boiler Room
047-A3.05_Phase_2_-_Boiler_Room.tif
0 KB
 048
 A4.00
Building Sections
048-A4.00_Building_Sections.tif
0 KB
 049
 A4.01
Wall Sections
049-A4.01_Wall_Sections.tif
0 KB
 050
 A4.02
Wall Sections
050-A4.02_Wall_Sections.tif
0 KB
 051
 A4.03
Wall Sections
051-A4.03_Wall_Sections.tif
0 KB
 052
 A4.04
Wall Sections
052-A4.04_Wall_Sections.tif
0 KB
 053
 A4.05
Wall Sections
053-A4.05_Wall_Sections.tif
0 KB
 054
 A5.00
Details
054-A5.00_Details.tif
0 KB
 055
 A5.01
Details
055-A5.01_Details.tif
0 KB
 056
 A5.02
Details
056-A5.02_Details.tif
0 KB
 057
 A5.03
Details
057-A5.03_Details.tif
0 KB
 058
 A5.04
Details
058-A5.04_Details.tif
0 KB
 059
 A5.05
Details
059-A5.05_Details.tif
0 KB
 060
 A5.06
Details
060-A5.06_Details.tif
0 KB
 061
 A5.07
Detail - Cabinetry
061-A5.07_Detail_-_Cabinetry.tif
0 KB
 062
 A6.00
Phase 1 - Reflected Ceiling Plan
062-A6.00_Phase_1_-_Reflected_Ceiling_Plan.tif
0 KB
 063
 A6.01
Phase 1 - Enlarged RCP
063-A6.01_Phase_1_-_Enlarged_RCP.tif
0 KB
 064
 A6.02
Add Alternate - RCP
064-A6.02_Add_Alternate_-_RCP.tif
0 KB
 065
 A7.00
Door & Window Types & Schedule
065-A7.00_Door_&_Window_Types_&_Schedule.tif
0 KB
 066
 A7.01
Room Finish Schedule & Details
066-A7.01_Room_Finish_Schedule_&_Details.tif
0 KB
 067
 A8.00
Main Floor Covering Plan
067-A8.00_Main_Floor_Covering_Plan.tif
0 KB
 068
 A8.01
Enlarged and Alt. Floor Covering Plan
068-A8.01_Enlarged_and_Alt._Floor_Covering_Plan.tif
0 KB
 069
 S1.00
Structural Notes
069-S1.00_Structural_Notes.tif
0 KB
 070
 S2.01
Foundation Plan - North
070-S2.01_Foundation_Plan_-_North.tif
0 KB
 071
 S2.02
Foundation Plan - South
071-S2.02_Foundation_Plan_-_South.tif
0 KB
 072
 S2.03
Roof Framing Plan - North
072-S2.03_Roof_Framing_Plan_-_North.tif
0 KB
 073
 S2.04
Roof Framing Plan - South
073-S2.04_Roof_Framing_Plan_-_South.tif
0 KB
 074
 S2.05
Add. Alternates
074-S2.05_Add._Alternates.tif
0 KB
 075
 S5.01
Structural Sections
075-S5.01_Structural_Sections.tif
0 KB
 076
 S5.02
Structural Sections
076-S5.02_Structural_Sections.tif
0 KB
 077
 S5.03
Structural Sections
077-S5.03_Structural_Sections.tif
0 KB
 078
 S5.04
Structural Sections
078-S5.04_Structural_Sections.tif
0 KB
 079
 ME1
Motor Schedule, Legends, & Sheet Index
079-ME1_Motor_Schedule,_Legends,_&_Sheet_Index.tif
0 KB
 080
 ME2
Mechanical & Electrical Site Plan
080-ME2_Mechanical_&_Electrical_Site_Plan.tif
0 KB
 081
 ME3
Elem
081-ME3_Elem._Main_Floor_-_Mechanical_Demolition_Plan.tif
0 KB
 082
 ME4
Elem
082-ME4_Elem._Main_Floor_-_Electrical_Demolition_Plan.tif
0 KB
 083
 ME5
Elem
083-ME5_Elem._Second_Floor_-_M_&_E_Demolition_Plan.tif
0 KB
 084
 ME6
Gym
084-ME6_Gym._-_M_&_E_Demolition_Plan.tif
0 KB
 085
 M7
Below Grade Plumbing Plan - Phase 1 Addition
085-M7_Below_Grade_Plumbing_Plan_-_Phase_1_Addition.tif
0 KB
 086
 M8
Above Grade Plumbing & Hydronics Plan - Phase 1 Addition
086-M8_Above_Grade_Plumbing_&_Hydronics_Plan_-_Phase_1_Addition.tif
0 KB
 087
 M9
HVAC Plan - Phase 1 Addition
087-M9_HVAC_Plan_-_Phase_1_Addition.tif
0 KB
 088
 M10
Exist
088-M10_Exist._Elem._Main_Floor_-_Plumbing_&_Hydronics_Plan.tif
0 KB
 089
 M11
Exist
089-M11_Exist._Elem._Second_Floor_-_Plumbing_&_Hydronics_Plan.tif
0 KB
 090
 M12
Exist
090-M12_Exist._Elem._Main_Floor_-_HVAC_Plan.tif
0 KB
 091
 M13
Exist
091-M13_Exist._Elem._Second_Floor_-_HVAC_Plan.tif
0 KB
 092
 M14
Exist
092-M14_Exist._Gym._-_Plumbing_&_Hydronics_Plan.tif
0 KB
 093
 M15
Exist
093-M15_Exist._Gym._-_HVAC_Plan.tif
0 KB
 094
 M16
Plumbing Fixture Schedule
094-M16_Plumbing_Fixture_Schedule.tif
0 KB
 095
 M17
Mechanical Details
095-M17_Mechanical_Details.tif
0 KB
 096
 M18
Mechanical Details, Sections, & Schedules
096-M18_Mechanical_Details,_Sections,_&_Schedules.tif
0 KB
 097
 M19
Mechanical Schedules
097-M19_Mechanical_Schedules.tif
0 KB
 098
 E7
Power & Data Plan - Phase 1 Addition
098-E7_Power_&_Data_Plan_-_Phase_1_Addition.tif
0 KB
 099
 E8
Lighting Plan - Phase 1 Addition
099-E8_Lighting_Plan_-_Phase_1_Addition.tif
0 KB
 100
 E9
Special Systems Plan - Phase 1 Addition
100-E9_Special_Systems_Plan_-_Phase_1_Addition.tif
0 KB
 101
 E10
Electrical Roof Plan - Phase 1 Addition
101-E10_Electrical_Roof_Plan_-_Phase_1_Addition.tif
0 KB
 102
 E11
Elem
102-E11_Elem._Main_Floor_-_Electrical_Plan.tif
0 KB
 103
 E12
Elem
103-E12_Elem._Second_Floor_-_Electrical_Plan.tif
0 KB
 104
 E13
Gym
104-E13_Gym._Electrical_Plan.tif
0 KB
 105
 E14
Electrical Details
105-E14_Electrical_Details.tif
0 KB
 106
 E15
Panel Schedules
106-E15_Panel_Schedules.tif
0 KB