|
PreBid Date:
|
Site visits are available upon request.
|
|
PreBid Info:
|
Prior to submitting his/her proposal, the Contractor shall make whatever onsite
and off-site studies of surface and subsurface conditions he/she considers necessary to assure
himself/herself that conditions are known to the degree he/she considers acceptable. Arrangements to make on-site studies (borings, test pits, etc.) before bids are submitted shall be made through the
Architect. If the site is disturbed by such studies, appropriate repairs shall be made by the party making
such studies.
|