Contact:
|
David Stirtz
|
PreBid Date:
|
07/23/2025
2 PM CST
|
PreBid Info:
|
A Pre-Bid Conference will be held at the project site, NUTRITION SERVICES / DON
CLIFTON LEARNING CENTER AT 710 HILL STREET, LINCOLN, NEBRASKA
AT 2:00 PM, WENESDAY, JULY 23, 2025. Park in the west parking lot and enter through west
door #3.
Attendance by all interested Contractors is highly recommended.
|
|
Company:
|
Architectural Design Associates
|
Bid Date:
|
07/31/2025
2 PM CST
|
Bid Info:
|
Sealed proposals will be received by the Board of Education of the Lancaster County School
District 55-0001, at the Operations Department, 800 South 24th Street, Lincoln, NE 68510, up to
the hour of:
2:00 PM, LOCAL TIME, ON THURSDAY, THE 31ST OF JULY, 2025
|
|
Project Location:
|
Lincoln, NE
|
|
|
|
|
|
Public Notes:
|
The work involves all construction indicated on the drawings and specifications, included but not
limited to the following: The scope of work will include the reroof of approximately 36,650 sq ft of
existing EPDM roof at the LPS Nutrition Services / Don Clifton Learning Center building, at 710
Hill Street, Lincoln, NE including slice and dice of existing roof system and addition of poly-iso
insulation, cover board and fully adhered EPDM roofing as indicated in the construction
documents.
|
|
Job Purchase Information:
|
Paid digital content is available via "Credit Card" payment method only.
Bid Documents may be obtained from the offices of A&D Technical Supply Co., Inc.- 4320 S. 89th Street, Omaha, NE 68127, (402)-592-4950.
- 1822 āNā Street, Lincoln NE 68508, (402)-474-5454
A digital downloads containing a full set of Bid Documents in PDF format are available upon receipt of a non-refundable card payment in the amount of $20.00 payable to A&D Technical Supply Co., Inc.
A printed copy of bid documents can be obtained upon receipt of a refundable deposit check in the amount of $25.00 payable to Lincoln Public Schools.
*An OBE Non-Cash Builder's Card will be accepted in lieu of deposit check.
Only complete sets of Bid Documents may be obtained - no partial set orders will be issued.
If shipping of Bid Documents is required, there is a non-refundable fee in the amount of $30.00 payable to A&D Technical Supply Co., Inc.
Please Note: Bid Documents MUST be returned, in good condition, within 30 calendar days from the BID DATE of the project to obtain a deposit refund.
If Bid Documents are NOT returned within the time specified, the deposit check will be forfeited.
|
|
|
|
|
|