|
Contact:
|
Ben Brewer
|
PreBid Date:
|
03/26/2025
2 PM CST
|
PreBid Info:
|
A non-mandatory Pre-Bid Meeting is March 26th, 2025 at 2:00 PM.
|
|
Company:
|
Erickson Sullivan Architects
|
Bid Date:
|
04/03/2025
3 PM CST
|
Bid Info:
|
Bids will be received at the Department of Transportation Operations Division, located at 5001 S. 14th Street, Lincoln,
Nebraska, until 3:00:00 PM, local time on April 3rd, 2025 and will then be publicly opened and read aloud.
|
|
Project Location:
|
Lincoln, NE
|
|
|
|
|
|
Public Notes:
|
The scope of work anticipated for the Hill Sign Building includes the re-roof of approximately
15,000 square feet. Work shall include the removal of the existing roofing, insulation and edge metals in all areas
and replacement with a tapered insulation system and fully adhered, 90 mil, 30 year no dollar limit warranty,
EPDM membrane system, and parapet wall repair.
|
|
Job Purchase Information:
|
Paid digital content is available via "Credit Card" payment method only.
Bid Documents may be obtained from the offices of A&D Technical Supply Co., Inc.- 4320 S. 89th Street, Omaha, NE 68127, (402)-592-4950.
- 1822 āNā Street, Lincoln NE 68508, (402)-474-5454
A digital downloads containing a full set of Bid Documents in PDF format are available upon receipt of a non-refundable card payment in the amount of $20.00 payable to A&D Technical Supply Co., Inc.
A printed copy of bid documents can be obtained upon receipt of a refundable deposit check in the amount of $40.00 payable to A&D
*An OBE Non-Cash Builder's Card will be accepted in lieu of deposit check.
Only complete sets of Bid Documents may be obtained - no partial set orders will be issued.
If shipping of Bid Documents is required, there is a non-refundable fee in the amount of $30.00 payable to A&D Technical Supply Co., Inc.
Bid Documents MUST be returned, in good condition, within 14 calendar days from award of the project to obtain a deposit refund.
If Bid Documents are NOT returned within the time specified, the deposit check will be forfeited.
|
|
Addenda- 03/28/2025 - Addendum #1 - Sign Shop was posted and emailed 3/28/25 Click to View
|
|
|
|