|
Contact:
|
Greg Perry
|
PreBid Date:
|
No pre-bid conference will be held.
|
PreBid Info:
|
|
|
Company:
|
Eagle Engineering Group LLC
|
Bid Date:
|
09/07/2023
10:00 AM CST
|
Bid Info:
|
Sealed Bids for the construction of the Stillwater Phase 2 - Water Main, Sanitary Sewer, Storm Sewer,
and Paving Improvements will be received, by the City of Valley, Nebraska, at the office of the Engineer,
EAGLE ENGINEERING GROUP, until 10:00 AM local time on Thursday, September 07, 2023,
at which time the Bids received will be “publicly” opened and read.
|
|
Project Location:
|
Valley, Nebraska
|
|
|
|
|
|
Public Notes:
|
The Project consists of constructing
1,200 LF of 8-inch DI Water Main, 1,200 LF of PVC Sanitary Sewer, 200 LF of RCP Storm Sewer, 3,900 SY
of 7-inch Concrete Pavement, and various other miscellaneous appurtenances.
|
|
Job Purchase Information:
|
Bid Documents may be obtained from the office of A&D Technical Supply Co., Inc., 4320 S. 89th Street, Omaha, NE 68127, (402) 592-4950 upon receipt of a refundable deposit in the amount of $60.00 payable to Eagle Engineering Group
*An OBE Non-Cash Builder's Card will be accepted in lieu of deposit check.
CD's and Electronic Downloads containing a full set of Bid Documents in PDF format are available upon receipt of a non-refundable fee in the amount of $20.00 payable to A&D Technical Supply Co., Inc.
Only complete sets of Bid Documents may be obtained - no partial set orders will be issued.
If shipping of Bid Documents is required, there is a non-refundable fee in the amount of $40.00 payable to A&D Technical Supply Co., Inc.
If shipping of CD is required, there is a flat fee in the amount of $9.00 payable to A&D Technical Supply Co., Inc.
Bid Documents MUST be returned, in good condition, within 14 calendar days from award of the project to obtain a deposit refund.
If Bid Documents are NOT returned within the time specified, the deposit check will be forfeited.
|
|
|
|
|
|