2019 Veteran's Housing Tri-Plex Buildings in Thunderway Addition

PLEASE NOTE: The bid date on this project has changed. The new bid date is November 29th, 2022 at 4pm.
           Place Order 

 

    

Contact:   Randy Hess
PreBid Date:   Not furnished
PreBid Info:   PreBid Date will be determined, and bidders will be notified.

Company:   The Nance Hess Company
Bid Date:   11/29/2022 04:00 PM CST
Bid Info:   Sealed lump sum bids are invited from non-Indian as well as Indian bidders that are more than 50% Indian owned and controlled. WHDC will receive sealed bids for the construction of two single level buildings until 4:00 p.m. on Nov 29th, 2022, at the WHDC office located at the corner of Beck and Elm Streets, Winnebago, Nebraska 68071, after which time bids will be opened, read aloud, recorded, and accepted for consideration. Bids received after this time will not be accepted. Prior to bid openings and by a date established by WHDC, all bidders, Indian and non-Indian, must submit to the WHDC on a Commission form, a pre-qualification application that is available from the WHDC. In addition, bidders seeking Indian Preference must also submit at that time, evidence of more than 50% Indian ownership and control. Award of this Project will be made to the lowest responsive and responsible bidder but only after preference is given to Indian bidders using the X factor contained as explained in the bidding documents. The Authority reserves the right to reject any and all bids and to waive irregularities.

Project Location: Winnebago Indian Reservation, Nebraska

Public Notes:
The project is for the construction of two single level buildings containing three one-bedroom apartments with one of those units a handicap apartment. Each building is approximately 2,221 square feet slab-ongrade foundation, wood frame with brick, stone, and rock veneer, with cement board siding above on all sides; and roofing material is 1 ½” Mini-Batten Architectural Metal Roof Panels. Each apartment shall have its own front and back entry door, a full bathroom, kitchen, dining area, living room, and closets; Energy Star doors and windows, Mini-Split HVAC system, instant water heater, and electrical system with LED lighting and Radon systems. Work includes site work and parking area and any other work as outlined in the plans and specifications. Contractor will construct Longtail Court street approximately 584 lineal feet of 7” PCC Paving with curb and gutter; and construct approximately 590 lineal feet of 6” water main and any other work as outlined in the plans and specifications. This includes 2 storm sewer inlets and some RCP pipe.



Job Purchase Information:
Bid Documents may be obtained from the office of A&D Technical Supply Co., Inc., 4320 S. 89th Street, Omaha, NE 68127, (402) 592-4950 upon receipt of a non-refundable fee in the amount of $40.00 payable to A&D Technical Supply Co., Inc. *A Builder's Card will NOT be accepted on this project.

CD's and Downloads containing a complete set of Bid Documents in PDF format are available upon receipt of a non-refundable fee in the amount of $25.00 payable to A&D Technical Supply Co., Inc.
Only complete sets of Bid Documents may be obtained.

If shipping of Bid Documents is required, there is a non-refundable fee in the amount of $30.00 payable to A&D Technical Supply Co., Inc.
If shipping of CD is required, there is a flat fee in the amount of $9.00 payable to A&D Technical Supply Co., Inc.

Bid Documents are available PURCHASE ONLY.
Do NOT return Bid Documents as no deposit refund will be issued.


Addenda
  • 04/29/2022 - Addendum #1 Addendum #1 was posted on 4-29-2022  Click to View
  • 05/12/2022 - Addendum #2 Addendum #2 was posted on 5-12-2022  Click to View
  • 06/09/2022 - Addendum #3 Addendum #3 was posted on 6-9-2022  Click to View
  • 06/23/2022 - Addendum #4 Addendum #4 was posted on 6-23-2022  Click to View
  • 06/30/2022 - Addendum #5 Addendum #5 was posted on 6-30-2022  Click to View
  • 07/14/2022 - Addendum #6 Addendum was posted on 07/14/2022.  Click to View
  • 08/04/2022 - Addendum #7 Addendum #7 was posted and e-mailed on 8/4/2022 4  Click to View
  • 08/22/2022 - Addendum #8 Addendum 8 was uploaded 08/22/2022  Click to View
  • 08/30/2022 - Addendum #9 Addendum #9 was posted and e-mailed 8/30/2022  Click to View
  • 09/15/2022 - Addendum #10 Addendum #10 was Posted and e-mailed on 09/15/2022  Click to View
  • 09/30/2022 - Addendum #11 Addendum #11 was posted and e-mailed on 09/30/2022  Click to View
  • 10/14/2022 - Addendum #12 Addendum #12 was posted and e-mailed on 10/14/2022.  Click to View
  • 10/28/2022 - Addendum #13 Addendum #13 was posted and e-mailed on 10/28/2022  Click to View
  • 11/03/2022 - Addendum #14 Addendum #14 was posted and e-mailed on 11/03/2022  Click to View
  • 11/10/2022 - Addendum #15 Addendum #15 was posted and e-mailed on 11/10/2022  Click to View
  • 11/18/2022 - Addendum #16 Addendum #16 was posted and e-mailed on 11/18/2022  Click to View