A & D's Planroom Options
A & D Home
Distribution Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
   Additional Planrooms
State of NE Building Div. Planroom

Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
SCC - RFP for CM@R for Lincoln Residence Hall

.
           Place Order 

 

    

Contact:   Derek Aldridge
PreBid Date:   None listed.
PreBid Info:  

Company:   Perry Law Firm
Bid Date:   11/10/2021 02:00 PM CST
Bid Info:   Proposals must be received by the College no later than 2:00 p.m. on November 10, 2021/ Proposals shall be delivered electronically, by email or hyperlink to file storage location. More information on electronic submission can be found in the RFP. Only such proposals as have been received by the College by the time and on the date listed above, will be considered.

Project Location: Lincoln, NE

Public Notes:
NOTICE is hereby given that the Board of Governors for the Southeast Community College Area is hereby requesting proposals from qualified construction management forms to provide preconstruction design consulting and CM@R services.

The proposed Project will consist of the following:
A new, approximately 250 bed/unit, four story residence hall building with associated spaces for student gatherings. Construction will be Type II-B R-2 Occupancy type. The residence hall building is anticipated to be designed as a steel frame structure with a cast-in-place concrete foundation system. This building project shall include all site civil, landscaping, general, mechanical, plumbing and electrical construction.

The Owner will determine at a later date whether this optional Project is to be include and added to the Scope of Project:
A second new approximately 250 bed/unit, four story residence hall building with associated spaces for student gatherings. Construction will be Type II-B R-2 Occupancy type. The residence hall building is anticipated to be designed as a steel frame structure with a cast-in-place concrete foundation system. This building project shall include all site civil, landscaping, general, mechanical, plumbing and electrical construction.

The expected total budget for each project is anticipated not to exceed twenty-five million dollars $25,000,000.00.



Job Purchase Information:
Bid documents are available from A&D Technical Supply Co., Inc. 1822 N Street, Lincoln NE 68508. 402-474-5454, planroom@ad4lincoln.com

A digital copy of bid documents is available for a non-refundable fee of $15.00 paid to A&D Technical Supply.

A printed copy of bid documents is available for a non-refundable fee of $20.00 paid to A&D Technical Supply Co.

If needed, printed documents can be mailed UPS for an additional non-refundable payment of $15.00 to A&D Technical Supply.

Use the place order link in the top right to get started.


Addenda
  • 11/04/2021 - Addenda #1 - Attachments (11-04-21)   Click to View
  • 11/04/2021 - Addenda #1 - SCC RFP Manual (11-04-21)   Click to View