A & D's Planroom Options
A & D Home
Distribution Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
   Additional Planrooms
State of NE Building Div. Planroom

Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
MCC Mitigation Design

.
           Place Order 

 

    

Contact:   Ron Feuerbach
PreBid Date:   Not furnished
PreBid Info:   A pre-bid conference is not planned. However, a site tour can be requested by contacting the engineer at 402-491-4144.

Company:   Morrissey Engineering
Bid Date:   11/09/2020 2:00 PM CST
Bid Info:   BIDS ARE DUE: 2:00 P.M.(CST), Monday, November 9th, 2020. Bids will only be accepted electronically by emailing scanned copies to: Richard Hanneman, Director of Administrative Management, Metropolitan Community College, 30th & Fort Streets, Building 30, Omaha, Nebraska 68103-0777, e-mail: RHanneman@mccneb.edu

Project Location: Omaha, Nebraska

Public Notes:
The project requires installation of bipolar ionization equipment on air handling equipment in multiple buildings on multiple campuses including Fort Omaha Campus (FOC), South Omaha Campus (SOC), Elkhorn Valley Campus (EVC), Fremont Area Campus (FAC), Sarpy Center (SRP), and the Applied Technology Center (ATC). Temperature control system modifications are also required on various units to increase outside air ventilation when operating in Ventilation Mode.



Job Purchase Information:
Bid Documents may be obtained from the office of A&D Technical Supply Co. Inc., 4320 S. 89th Street, Omaha, NE 68127, (402) 592-4950,
CD's and Downloads containing a complete set of Bid Documents in PDF format are available upon receipt of a non-refundable fee in the amount of $20.00 payable to A&D Technical Supply Co., Inc.

If shipping of CD is required, there is a non-refundable fee in the amount of $9.00 payable to A&D Technical Supply Co., Inc.


Addenda
  • 11/03/2020 - Addendum #1 was e-mailed 11-3-2020 and can be downloaded at www.adtechsupply.com  Click to View
  • 11/04/2020 - Addendum 02 11-4-2020 Addendum #2 was emailed 11/4/2020  Click to View
  • 11/09/2020 - Addendum #3 was e-mailed 11-9-2020.  Click to View